How a restoration runs

Four steps, always in the same order. First we measure what is there. Then we decide what to add.

  1. Survey

    We measure the house and draw what is there, wall by wall.

    For a two-storey house, two days on site.

    What you get: Plans, elevations and sections of the house as it is, and a short report on the stone and the plaster.

The dashed line: what exists, measured and kept.

The red line: what is proposed, what we'll add.

  1. Drawings

    On every sheet, a dashed line for what exists and a solid line for what is proposed. We meet over them two or three times.

    Six to ten weeks.

  2. Permit

    We file the drawings with the local planning committee, and for a listed house with the conservation department too.

    The wait is theirs, not ours: usually four to eight months.

  3. On site

    A visit at least once a week, until the house is ready. The builder is yours; we check that what is built is what was drawn.

    For as long as the building takes.

The first meeting

A first meeting at the house itself, an hour and a half. Bring old photos, if you have them. ₪750, credited against the survey if we go on.

What it costs, by the house

The houseSurveyDrawings and permit
A one-storey house, up to 120 m²₪8,500₪48,000
A house of two or three storeys₪14,000₪76,000
A listed house (marked in the local plan)₪22,000 (Survey and record file)₪96,000

On site: ₪3,200 a month, for any house, at least one visit a week.

Prices before VAT. Fees to the authorities, consultants (structural engineer, licensed surveyor) and changes the committee asks for are not included. The prices on this sample site are fictional.